PROVEN RESERVES: 4.2B BOE
DRILLING SUCCESS: 68%
YAMAL BASIN-Y3: ACTIVE EXTRACTION
GEOSCIENCE ACCURACY: 94.2%
TRUNK PIPELINE INTEGRITY: 99.7%
RAIL-FREIGHT CAPACITY: 18.4M T/YR
MARINE TERMINAL STATUS: OPERATIONAL
PROVEN RESERVES: 4.2B BOE
Subsurface Intelligence Division

Strategic Exploration & Geoscience

Deploying 4D seismic intelligence, sovereign reservoir modeling, and integrated trunk pipeline corridor mapping to secure long-term industrial energy yields across marine, rail, and pipeline logistics networks.

4.2B

BOE Proven Reserves

12.5M

Acres Under License

68%

Exploration Success Index

99.7%

Pipeline Integrity Rate
Exploration Technology

Advanced Geoscience Capabilities

Our upstream operations integrate sovereign-grade subsurface intelligence with multi-modal logistics planning—ensuring every discovery is commercially viable and logistically executable via marine terminals, rail-freight corridors, and trunk pipeline systems.

4D Seismic Imaging

Time-lapse acoustic waveform inversion monitors fluid migration and pressure gradients in real-time, enabling dynamic reservoir management across Yamal, East Siberia, and Arctic offshore blocks.

Petrophysical Core Analysis

Laboratory-grade micro-analysis of core samples determines absolute porosity matrices, permeability anisotropy, and fluid saturation profiles across all stratigraphic layers.

Integrated Logistics Modeling

Reservoir development plans are co-optimized with trunk pipeline routing, rail-freight capacity scheduling, and marine terminal berth allocation to ensure commercial readiness at first oil.

AI Reservoir Forecasting

Machine learning models trained on 15+ years of production data predict decline curves, water breakthrough timing, and optimal well placement with 94.2% accuracy.

Environmental Baseline Mapping

Pre-drill ecological surveys, permafrost stability modeling, and biodiversity impact assessments ensure full compliance with Russian Federal Law 7-FZ and international ESG standards.

Digital Twin Integration

Every asset is mirrored in a real-time digital twin that synchronizes subsurface data, surface facilities, and logistics corridors for unified operational decision-making.

Reservoir Characterization

Validated Petrophysical Parameters

All measurements comply with GOST, ASTM, and ISO standards. Data verified by independent third-party auditors.

Analyzed Component Methodology Standards Observed Value Confidence Interval
API GravityASTM D1298 / ISO 367539.5° API±0.3°
Permeability MatrixGOST 26450.2145 mD±8 mD
Reservoir Saturation (So)GOST 2554378.2%±2.1%
Porosity (Effective)ISO 15901-322.4%±1.5%
Water Cut Forecast (Yr 5)Internal BTK Model v4.231.8%±4.2%
CO₂ Content (Raw Gas)GOST 237610.82 mol%±0.05%
H₂S ConcentrationISO 19739<5 ppmND
Wax Appearance TempASTM D250024°C±2°C
Project Chronology

Exploration & Development Milestones

A disciplined, stage-gated approach to de-risking subsurface opportunities and accelerating time-to-first-production.

Q4 2023
Regional 3D Seismic Acquisition Complete

12,400 km² of high-density 3D seismic data processed across Yamal-Nenets Autonomous Okrug, enabling structural interpretation at 10m vertical resolution.

Q2 2024
Discovery Well Y-3A Spudded

Exploration well reached total depth of 4,850m; DST testing confirmed commercial flow rates of 1,240 bbl/day of 39.5° API crude.

Q4 2024
Integrated Logistics Feasibility Study

Multi-modal transport analysis confirmed viability of trunk pipeline tie-in to existing BTK corridor, with rail-freight backup capacity of 18.4M tons/year.

Q2 2025 (Projected)
FEED Study Completion & FID

Front-End Engineering Design to finalize facility specifications; Final Investment Decision scheduled pending regulatory approvals and offtake agreements.

Q4 2027 (Projected)
First Oil & Integrated Export

Commissioning of production facilities synchronized with marine terminal berth availability and rail-freight loading infrastructure for immediate commercial dispatch.

Strategic Asset Portfolio

Geographically Diversified Exploration Blocks

Each asset is evaluated not only for subsurface potential but for integration with BTK's existing marine, rail, and pipeline logistics infrastructure.

Yamal Peninsula

Block YN-7B

Shallow-marine clastic reservoirs with proven gas-condensate potential. Direct tie-in opportunity to existing trunk pipeline corridor.

License Area1,840 km²
Est. Resources890 MMBOE
East Siberia

Block ES-12C

Carbonate platform with light oil potential. Rail-freight corridor already mapped for future product evacuation to Pacific export terminals.

License Area2,150 km²
Est. Resources1.2B BOE
Arctic Offshore

Block AO-3A

Frontier exploration block with 4D seismic coverage. Marine terminal feasibility study underway for ice-class tanker loading operations.

License Area3,420 km²
Est. Resources2.1B BOE
Regulatory Alignment

Compliance & Technical Standards

All exploration activities adhere to Russian Federal Law 7-FZ "On Environmental Protection", GOST technical standards, and international ESG reporting frameworks.

GOST Compliance

All core analysis, fluid sampling, and reservoir testing performed per GOST 26450.2, 25543, and 23761 standards.

Environmental Permitting

Full EIA documentation submitted to Rosprirodnadzor; biodiversity action plans approved for all active license areas.

Industrial Safety

Zero LTI record maintained across all exploration campaigns; HSE protocols aligned with IOGP guidelines.

ESG Disclosure

Annual sustainability reporting aligned with SASB Oil & Gas Standard and TCFD climate risk framework.

Technical Partnership

Collaborate on Subsurface Innovation

ООО "АВТОДОРТРЕЙД-БТК" welcomes technical partnerships with service companies, research institutions, and technology providers to advance exploration efficiency, reservoir recovery, and integrated logistics planning.

Submit Technical Proposal